Loading...
HomeMy WebLinkAbout09-011-TRN-001 Contract Modification 1 Modification 01 - TaskDate Order January Number4,2010 09-011-TRN-001 ��" ° Issued Under Basic Ordering Agreement 08-040-ADM-010 90O1S Modification No. 01 Page 1 of 2 Pages Task Order No. 09-011-TRN-001 Task Order Title Topographical Survey& Engineering for Street and Storm Improvements at 6th Street Prime Contractor Northwest Datum& Design, Inc. Background In response to meetings with local residents,the City is adding sidewalk on the south side of 6th Street from that originally planned for the 6th Street Reconstruction Project. It is now planned that the sidewalk will extend down K Avenue up to N Avenue. In consideration of the additional work,the not-to-exceed price of this Task Order will be increased from$52,900 by $12,492.90 to$65,392.90 Accordingly,the original Task Order is modified as follows: Under DESCRIPTION OF TASK ASSIGNMENT, insert the following as the second paragraph to this section: Per Modification 01 to the Task Order, the Consultant shall also survey and complete the topo to include 3 additional blocks on the south side of 6th Street down K Avenue up to N Avenue. The Consultant shall topo from the centerline of 6th Street to the south right-of-way line for these 3 blocks and include storm drainage utilities to support the design of new curb returns and adjust the catch basins design if necessary. The plans shall provide a note advising the construction contractor to demo the existing sidewalk and water meters to allow for the construction of a 10-foot wide sidewalk and 30-foot curb returns that the Consultant shall design. This new work shall be included on 3 additional plan sheets: the top-half of each plan sheet shall show the existing condition and demo plan and the bottom-half shall show the new construction. Under COMPENSATION,the first sentence is revised to read, "The work described in this Task Order shall be performed on a time and materials (T&M) basis for a not-to-exceed price of Sixty Five Thousand Three Hundred Ninety-Two Dollars and Ninety Cents($65,392.90)." Under SCHEDULE, this section is revised to read, "The Consultant shall complete the services described above by December 31, 2009." All other terms remain unchanged. The parties acknowledge that there has been an opportunity to negotiate the terms and conditions of this Modification and agree to be bound accordingly. CITY OF ANACORTES NORTHWEST DATUM &DESIGN, INC. JJ ByJ. By �� " H. Dean Maxwell, Mayor - Signature / �Date / /? / 0 Printed Name d �� S / / / Title -eio +G-Grz 7 Date l/5fO Modification 01 to Task Order 09-011-TRN-001 Issued Under Basic Ordering Agreement 08-040-ADM-010 Northwest Datum &Design, INC. Page 2 of 2 FOR GOVERNMENT USE ONLY Original Agreement Amount $52,900.00 Original Contract Completion Date 7/31/2009 Current Agreement Amount $52,900.00 Current Contract Completion Date 7/31/2009 Change Per this Modification $12,492.90 Net Change 153 days Total After Amendment $65,392.90 Contract Completion Date After Change 12/31/2009 Approval Recommended ❑Approved CD1 crI-f ) Project Manager '� Date � oval ecom �:j•�. ❑Approved i (0 Iv Publ�Wor s Dir- •r k a Date ,Approval Recommended ❑Approved /I /�ADP (•-►•/ ance Date